• About
    • About Us
    • What We Cover
  • Advertise
    • Advertise
    • Our Advertisers
  • Contact
  • Donate
  • Send News

Oak Ridge Today

  • Home
  • Sign in
  • News
    • Business
    • Community
    • Education
    • Government
    • Health
    • Police and Fire
    • U.S. Department of Energy
    • Weather
  • Sports
    • High School
    • Middle School
    • Recreation
    • Rowing
    • Youth
  • Entertainment
    • Arts
    • Dancing
    • Movies
    • Music
    • Television
    • Theater
  • Premium Content
  • Obituaries
  • Classifieds

City considers $500K for Woodland Elementary repairs

Posted at 8:44 am May 10, 2012
By John Huotari Leave a Comment

Woodland Elementary Library Cracks

A vertical crack has formed between two walls in the Woodland Elementary School library, where the soil has settled and part of the building has dropped.

Brick walls are bulging and cracking, and concrete slabs are shifting and sinking.

During one weekend in August, a vertical crack as wide as about two inches opened between two walls in the library. Entire walls had shifted and the building had dropped after soil underneath it settled, said Allen Thacker, Oak Ridge Schools supervisor of maintenance and operations.

A structural engineer was called immediately, and already-planned repairs at Woodland Elementary School have now become a high priority.

“It was substantial shifting,” Thacker said.

Merit Construction of Knoxville has been selected to make $1 million worth of repairs in a two-month project at Woodland this summer. A pier will be put underneath the library, and the building will be lifted back up, with supports installed every six to eight feet.

About one-third of the library, or roughly 900 square feet, is now walled off from students and staff.

Woodland Elementary Flashing

Metal flashing has been installed over an entrance at Woodland Elementary School to keep bricks from falling.

Outside, bricks have fallen from exterior walls, including over building entrances, and bricks still jut out in some places by as much as two inches.

Repairs have been made over the years, but more work is needed, Thacker said.

“This becomes a lot more than just maintenance,” he said.

The building’s brick exterior will be removed and replaced with a stucco-like material called EIFS. Concrete slabs will be cut out in three classrooms and replaced after harder soil is installed underneath.

The roof will be replaced, and a cafeteria wall and slab in a dry storage room will also be removed and replaced.

“You can feel it buckle and roll as you walk across it,” Thacker said.

Woodland Elementary Brick Cracks

Moisture and heating and cooling cycles have caused brick walls to bulge and crack.

The school system plans to use $500,000 of its own money for the repairs and will ask the Oak Ridge City Council for a $500,000 contribution on Monday.

Thacker said the school system has already paid for geotechnical surveys and architectural fees.

He said Woodland has four sections built between 1948 and 1989. The soil underneath the building can contract quite a bit — it’s settled as much as three inches — depending upon the moisture.

The repair work is scheduled to start June 4 and should be substantially complete by Aug. 1, Thacker said.

Filed Under: Education, Government Tagged With: Oak Ridge City Council, Oak Ridge Schools, renovation, Woodland Elementary School repairs

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

More Education News

Roane State celebrates construction milestone for new health science campus in west Knoxville 

Submitted Roane State Community College and its nonprofit Foundation hosted a ceremony on July 2, 2024, commemorating a major milestone in the construction of the college?s new Knox Regional Health Science Education … [Read More...]

UCOR awards $45,000 in STEM education mini-grants

Submitted Drones, a manufacturing simulator lab, and hands on meteorology are among the classroom projects that United Cleanup Oak Ridge (UCOR)?will fund through its 2024 mini-grants. UCOR awarded $45,000 in … [Read More...]

ORHS graduation could be rescheduled, moved depending upon weather

Rain and thunderstorms are possible Friday and Saturday, and the Oak Ridge High School graduation could be rescheduled or moved depending upon the weather. Oak Ridge Schools announced the plan on Tuesday. ORHS … [Read More...]

School staff not allowed to carry guns

Oak Ridge Schools will not allow teachers and other staff members to carry guns in buildings, Superintendent Bruce Borchers said Wednesday. Borchers made the announcement in a notice sent to school families. His … [Read More...]

Bruce Borchers

Borchers to discuss schools on Tuesday

Oak Ridge Schools Superintendent Bruce Borchers will discuss the state of the schools during a lunchtime meeting on Tuesday. The presentation will be hosted by the League of Women Voters of Oak Ridge. The Lunch with … [Read More...]

More Education

More Government News

Election is Thursday

The Anderson County general election and state and federal primary elections are Thursday. Competitive races include the Democratic and Republican primaries for U.S. Senate, Republican primary for Tennessee House of … [Read More...]

Kairos Power begins construction on demonstration reactor

Kairos Power has started construction on a test nuclear reactor in west Oak Ridge. The Hermes Low-Power Demonstration Reactor is the first of its type to be approved for construction by the U.S. Nuclear Regulatory … [Read More...]

County law director dies at 65

Anderson County Law Director Nicholas ?Jay? Yeager, of Clinton, died Friday. He was 65. Yeager was assistant attorney in Anderson County from 2001 to 2006, and he has been law director since then. "Mr. Yeager was … [Read More...]

Outdoor Pool to close for season Aug. 12

Indoor Pool to re-open Monday The Oak Ridge Outdoor Pool will closed for the season on Monday, August 12, and the Indoor Pool will re-open Monday, July 29, after being closed for a few months for renovations. The … [Read More...]

Tennis court dances recreate wartime event

Monthly dances by the Manhattan Project National Historical Park recreate the open-air tennis court dances that entertained 75,000 workers and their families in the Secret City during World War II. "Put on your … [Read More...]

More Government

Recent Posts

  • ORAU Annual Giving Campaign raises $91,479 in 2025
  • Alan Forbes named director of Safeguards & Security for ORAU and ORISE
  • ORAU and American Museum of Science and Energy Foundation formalize partnership to advance Manhattan Project 2.0
  • Author and Law Professor Derek W. Black to Speak on Public Education and Democracy
  • Anderson County Chamber Headquarters Dedication Set for October 17
  • ORISE announces winners of 2025 Future of Science Awards
  • SL Tennessee Supports New Anderson County Chamber Headquarters
  • ORAU 2025 Pollard Scholarship recipients announced
  • Democratic Women’s Club Hosts State Rep. Sam McKenzie
  • Flatwater Tales Storytelling Festival Announces 2025 Storytellers

Search Oak Ridge Today

Copyright © 2026 Oak Ridge Today