• About
    • About Us
    • What We Cover
  • Advertise
    • Advertise
    • Our Advertisers
  • Contact
  • Donate
  • Send News
  • Subscribe

Oak Ridge Today

  • Home
  • Sign in
  • News
    • Business
    • Community
    • Education
    • Government
    • Health
    • Police and Fire
    • U.S. Department of Energy
    • Weather
  • Sports
    • High School
    • Middle School
    • Recreation
    • Rowing
    • Youth
  • Entertainment
    • Arts
    • Dancing
    • Movies
    • Music
    • Television
    • Theater
  • Premium Content
  • Obituaries
  • Classifieds

Q&A: John Eschenberg on Uranium Processing Facility at Y-12

Posted at 3:53 pm January 21, 2013
By John Huotari Leave a Comment

Uranium Processing Facility

The proposed Uranium Processing Facility at the Y-12 National Security Complex. (Image courtesy of B&W Y-12)

The following is an edited version of a question-and-answer session with John Eschenberg, federal project director for the proposed Uranium Processing Facility at the Y-12 National Security Complex. Federal officials said last fall that the UPF could be larger than originally planned to make sure all the building’s equipment fits inside.

Q: What is the status of the UPF redesign?

A: UPF is currently at 66 percent of design completion. Once 90 percent design completion is achieved, we will submit a Critical Decision-2 (CD-2) package to headquarters for approval that will contain the complete cost and schedule baseline for UPF. This process, which involves both an independent cost estimate and an external independent review, will likely take several weeks to complete.

The cost range for UPF is unchanged: $4.2 billion-$6.5 billion.

National Nuclear Security Administration project staff members, with the assistance of independent industry experts, evaluated the additional engineering efforts required to resolve UPF’s space challenge, and as a result, they are proceeding with finalizing the design.

Q: How does the progress on the current design compare to the progress before the changes?

A: The UPF design is at 66 percent. It was at 75 percent before the design changes.

Q: When will the design be at 90 percent?

A: UPF is currently reworking the design cost and schedule plan submitted to NNSA to address some additional cost and schedule elements requested by NNSA. Following the re-submittal of the total project design cost and schedule plan, the project will be better prepared to determine when 90 percent design completion will be achieved.

Q: When will site readiness work start?

A: NNSA is expected to approve the UPF project’s site readiness Critical Decision package soon.  With this approval, the UPF project team will have the authorization to issue awards and begin work on site. Initial awards will be issued by plant contractor B&W Y-12 for electrical demolition and establishing a wet spoils area for unusable soil, followed by a contract award by the U.S. Army Corps of Engineers for the extension of Bear Creek Road and associated potable water lines.

Plans call for starting the site readiness work this winter. This will include preliminary work to relocate some of the existing utilities and Bear Creek Road.

Q: How many critical decisions (CDs) are left before the “big CD-2 package?” What is the number of the site readiness critical decision, and what CD comes after that?

A: The U.S. Department of Energy uses critical decisions to authorize proceeding to different phases of a project. The next CDs on UPF will establish the formal commitment on cost and schedule (CD-2), and allow the construction activities to begin (CD-3).

Furthermore, NNSA has subdivided the initial work at the Y-12 site into manageable scopes of work to allow for the maximum flexibility in contracting for that work. Each of these sub-projects have their own CDs (CD-2 and 3) before construction starts. There are three sub-projects (site readiness, site preparation, and the west end protected area reduction (WEPAR)) that should be accomplished before the CD-2 for the entire UPF project is finalized.

Site readiness will be the next CD approval on UPF.

***

The 350,000-square-foot UPF would replace four old buildings at Y-12, part of a years-long effort to update the 811-acre site, consolidate operations, and cut the plant’s high-security footprint from 150 acres to 15. Y-12 was built to enrich uranium during World War II as part of the top-secret Manhattan Project. The UPF would be the single largest post-war investment by the government in Tennessee.

This Q&A was conducted via e-mail with the help of Bridget Correll Waller, UPF strategic communications manager.

Filed Under: National Nuclear Security Administration, Top Stories, U.S. Department of Energy, Y-12 National Security Complex Tagged With: CD-2, CD-3, critical decision, John Eschenberg, National Nuclear Security Administration, NNSA, site readiness, U.S. Department of Energy, UPF, UPF design, UPF redesign, uranium processing facility, Y-12 National Security Complex

Advertisements


 

Join the club!

If you appreciate our work, please consider subscribing. Besides helping us, your subscription will give you access to our premium content.

Most of our stories are free, brought to you by Oak Ridge Today with help from our members—advertisers, subscribers, and sponsors.

But some are premium content, available only to members. Those are in-depth, investigative, or exclusive stories that are available only on Oak Ridge Today. They generally require at least four hours to report, write, and publish.

You can subscribe for as little as $5 per month.

You can read more about your options here.

We currently offer five primary subscription options to readers, and they include benefits.

Basic

  • Basic monthly subscription ($5 per month)—access premium content
  • Basic annual subscription ($60 per year)—access premium content

Pro

  • Pro monthly subscription ($10 per month)—access premium content, get breaking news emails first, and submit one press release or public service announcement per month
  • Pro annual subscription ($100 per year)—save $20 per year, access premium content, get breaking news emails first, and submit one press release or public service announcement per month

Temporary

  • Temporary access ($3 per week for two weeks)

We also have advanced subscription options. You can see them here.

We also accept donations. You can donate here.

If you prefer to send a check for a subscription or donation, you may do so by mailing one to:

Oak Ridge Today
P.O. Box 6064
Oak Ridge, TN 37831

Thank you for your consideration and for reading Oak Ridge Today. We appreciate your support.

Commenting Guidelines

We welcome comments, but we ask you to follow a few guidelines:

1) Please use your real name, including last name. Please also use a valid e-mail address.
2) Be civil. Don't insult others, attack their character, or get personal.
3) Stick to the issues.
4) No profanity.
5) Keep your comments to a reasonable length and to a reasonable number per article.

We reserve the right to remove any comments that violate these guidelines. Comments held for review, usually from those posting for the first time, may not post if they violate these guidelines. Thank you for your patience and understanding. Thank you also for reading Oak Ridge Today and for participating in the discussion.

More information is available here.

More U.S. Department of Energy News

Disposing of uranium waste could cost at least $7.2 billion

The U.S. Department of Energy estimates it could cost at least $7.2 billion to convert and dispose of tens of thousands of cylinders of depleted uranium hexafluoride, a dangerous, corrosive waste byproduct of the uranium … [Read More...]

Y-12 now getting power from Pine Ridge substation

Submitted The Y-12 National Security Complex flipped the switch on a new era as crews finalized the process of moving the entire site’s electrical supply to the new Pine Ridge substation. In June, the Building … [Read More...]

DOE picks Idaho for nuclear test reactor

The U.S. Department of Energy has decided to build a nuclear test reactor at Idaho National Laboratory to study fuels and materials. Besides INL, Oak Ridge National Laboratory had been considered as a potential site … [Read More...]

DOE bus tours restart in Oak Ridge

U.S. Department of Energy public bus tours have resumed in Oak Ridge after a two-year pause due to the COVID-19 pandemic. The tours began running again on July 11, and they are scheduled to continue through … [Read More...]

Crews prepare former ORNL reactors for demolition

The U.S. Department of Energy and cleanup contractor UCOR are preparing to demolish research reactor facilities at Oak Ridge National Laboratory. Crews are nearing the final stages of deactivation inside two former … [Read More...]

More DOE

Recent Posts

  • ORAU launches new app with a variety of resources available, including hundreds of STEM internships, fellowships and research opportunities
  • Disposing of uranium waste could cost at least $7.2 billion
  • Y-12 now getting power from Pine Ridge substation
  • Man sentenced to 8 years after fleeing, crashing, attempting carjackings
  • Three Ohio residents die in two-vehicle crash
  • DOE picks Idaho for nuclear test reactor
  • TBI investigating man’s death
  • Luminarias to feature peace messages
  • Oak Ridge tennis court dance is Thursday
  • DOE bus tours restart in Oak Ridge

Search Oak Ridge Today

About Us

About Oak Ridge Today
What We Cover

How To

Advertise
Subscribe

Contact Us

Contact Oak Ridge Today

Copyright © 2022 Oak Ridge Today