• About
    • About Us
    • What We Cover
  • Advertise
    • Advertise
    • Our Advertisers
  • Contact
  • Donate
  • Send News

Oak Ridge Today

  • Home
  • Sign in
  • News
    • Business
    • Community
    • Education
    • Government
    • Health
    • Police and Fire
    • U.S. Department of Energy
    • Weather
  • Sports
    • High School
    • Middle School
    • Recreation
    • Rowing
    • Youth
  • Entertainment
    • Arts
    • Dancing
    • Movies
    • Music
    • Television
    • Theater
  • Premium Content
  • Obituaries
  • Classifieds

Crews prepare Y-12 building for demolition by removing asbestos, water

Posted at 3:03 am January 31, 2024
By John Huotari Leave a Comment

Built in 1944, Beta-1 is a former Manhattan Project era enrichment facility at the Y-12 National Security Complex. The Oak Ridge Office of Environmental Management expects to demolish the 210,000-square-foot facility in 2026. (Photo courtesy Y-12/UCOR)

Workers have finished major pre-demolition work on a wartime building at Y-12 National Security Complex.

The deactivation work at the Beta-1 building included removing asbestos; old, brittle thorium-contaminated piping; and more than two million gallons of water.

The Oak Ridge Office of Environmental Management and its contractor UCOR have been working toward the deactivation milestone since 2020, a press release said. Workers finished deactivating the above-ground floors of the Beta-1 facility in December. Now, only deactivation work in the basement remains before the teardown can begin. Demolition of Beta-1 is expected to begin in 2026.

Beta-1 was built in 1944 to enrich uranium for the top-secret Manhattan Project during World War II. That federal project built the world’s first atomic bombs. Beta-1, a 210,000-square-foot, two-story building, was later converted to laboratory space for fusion-energy technology.

The Beta?1 Complex includes the Fusion Energy Technology Building, Helium Compressor Building, and a steel utility transformer. All three will be demolished together.

“Having safely and efficiently removed barriers, completing the building deactivation is a great achievement for our team,” said Billy Lloyd, UCOR project manager.

Oak Ridge workers remove asbestos as part of deactivation efforts inside the Beta-1 facility at the Y-12 National Security Complex. (Photo courtesy Y-12/UCOR)

According to the press release, workers faced a significant challenge at Beta-1: There was standing water in the basement due to old, failed sump pumps.

“To resolve this issue, crews installed a water treatment system and have since treated and removed more than two million gallons of water that previously stood in that area,” the press release said. “The system filters water to meet stringent water quality standards. Once filtered, the water is treated and discharged.”

Besides removing the water from the basement, crews removed contaminants from the above-ground structure. That included asbestos from pipes and floor and ceiling tiles. Crews also took out more than 100 linear feet of old, brittle thorium-contaminated piping, the press release said.

“With the above-ground deactivation complete and the basement pumped of water, the final step is to deactivate the basement prior to demolition,” the press release said.

“We continue to make great progress with the water treatment skid in place and are poised for a successful basement cleanup by fall 2024,” Lloyd said.

The next major demolition project at Y-12 is Alpha-2, another large Manhattan Project enrichment facility measuring 325,000 square feet, scheduled to begin this summer.

An Oak Ridge worker sprays fixative to support asbestos abatement efforts at the Beta-1 facility at the Y-12 National Security Complex. (Photo courtesy Y-12/UCOR)

More information will be added as it becomes available.

Many news stories on Oak Ridge Today are free, brought to you by Oak Ridge Today with help from our advertisers, contributors, and subscribers. This is a free story. Thank you to our advertisers, contributors, and subscribers. You can see what we cover here.


Do you appreciate this story or our work in general? If so, please consider a monthly subscription to Oak Ridge Today. See our Subscribe page here. Thank you for reading Oak Ridge Today!

Alternatively, you can donate to support our work here. Thank you for your support!

Copyright 2024 Oak Ridge Today. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Filed Under: Front Page News, Slider, U.S. Department of Energy, Y-12, Y-12 National Security Complex Tagged With: asbestos, Beta-1, Billy Lloyd, deactivation, demolition, Manhattan Project, Oak Ridge Office of Environmental Management, UCOR, Y-12 National Security Complex

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • ORAU and American Museum of Science and Energy Foundation formalize partnership to advance Manhattan Project 2.0
  • Author and Law Professor Derek W. Black to Speak on Public Education and Democracy
  • Anderson County Chamber Headquarters Dedication Set for October 17
  • ORISE announces winners of 2025 Future of Science Awards
  • SL Tennessee Supports New Anderson County Chamber Headquarters
  • ORAU 2025 Pollard Scholarship recipients announced
  • Democratic Women’s Club Hosts State Rep. Sam McKenzie
  • Flatwater Tales Storytelling Festival Announces 2025 Storytellers
  • Laser-Engraved Bricks Will Line Walkway of New Chamber Headquarters
  • Democratic Women’s Club to Discuss Climate Change, Energy and Policy

Search Oak Ridge Today

Copyright © 2025 Oak Ridge Today