• About
    • About Us
    • What We Cover
  • Advertise
    • Advertise
    • Our Advertisers
  • Contact
  • Donate
  • Send News
  • Subscribe

Oak Ridge Today

  • Home
  • Sign in
  • News
    • Business
    • Community
    • Education
    • Government
    • Health
    • Police and Fire
    • U.S. Department of Energy
    • Weather
  • Sports
    • High School
    • Middle School
    • Recreation
    • Rowing
    • Youth
  • Entertainment
    • Arts
    • Dancing
    • Movies
    • Music
    • Television
    • Theater
  • Premium Content
  • Obituaries
  • Classifieds

 

$1.3 million project will rebuild ORHS track

Posted at 4:48 pm January 15, 2022
By John Huotari Leave a Comment


An image by Cope Architecture of Knoxville showing what the rebuilt Ben Martin Track will look like at Oak Ridge High School.

 

A $1.3 million project is under way to rebuild the Ben Martin Track at Oak Ridge High School by June. The asphalt base of the eight-lane track dates back to the 1950s, the rubber surface is washing away, and holes are visible in the disintegrating and patched lanes. The pole vault has been unusable since 2017, and track coaches and athletes from other schools have recently declined to compete in Oak Ridge because of the conditions.

That is expected to change with the new renovated facility, which could host large invitational, sectional, and college track meets. The renovation project will rebuild the asphalt base of the track, add a new rubberized surface, and replace underground utilities. All field events except pole vault will move to the infield. Shot put and discus rings will be on the north end of the football practice field, while long jump and triple jump will be along the straight section of track nearest the bleachers. The pole vault will remain on the south side of the track, but it will move to the west end near the field house.

“This is a first phase of what we hope to be a larger project long-term,” Allen Thacker, Oak Ridge Schools supervisor of maintenance and operations, told the Oak Ridge Board of Education in October. “This is foundational.”

The project has been talked about “behind the scenes” for a handful of years, and there has been intense planning for about two years, according to those involved.

The rest of this story is available if you are a member: a subscriber, advertiser, or contributor to Oak Ridge Today. Already a member? Great! Thank you! Sign in here. Not a member? No problem! Subscribe here: Basic

  • Basic monthly subscription ($5 per month)—access premium content
  • Basic annual subscription ($60 per year)—access premium content

Pro

  • Pro monthly subscription ($10 per month)—access premium content, get breaking news emails first, and submit one press release or public service announcement per month
  • Pro annual subscription ($100 per year)—save $20 per year, access premium content, get breaking news emails first, and submit one press release or public service announcement per month

Temporary

  • Temporary access ($3 per week for two weeks)

If you prefer to send a check, you may do so by mailing one to: Oak Ridge Today P.O. Box 6064 Oak Ridge, TN 37831 We also have advanced subscription options. You can see them here. We also accept donations. You can donate here. A donation of $50 or more will make you eligible for a subscription. Thank you for reading Oak Ridge Today. We appreciate your support!

An image by Cope Architecture of Knoxville showing what the rebuilt Ben Martin Track will look like at Oak Ridge High School.

A $1.3 million project is under way to rebuild the Ben Martin Track at Oak Ridge High School by June. The asphalt base of the eight-lane track dates back to the 1950s, the rubber surface is washing away, and holes are visible in the disintegrating and patched lanes. The pole vault has been unusable since 2017, and track coaches and athletes from other schools have recently declined to compete in Oak Ridge because of the conditions.

That is expected to change with the new renovated facility, which could host large invitational, sectional, and college track meets, according to those involved. The renovation project will rebuild the asphalt base of the track, add a new rubberized surface, and replace underground utilities. All field events except pole vault will move to the infield. Shot put and discus rings will be on the north end of the football practice field, while long jump and triple jump will be along the straight section of track nearest the bleachers. The pole vault will remain on the south side of the track, but it will move to the west end near the field house.


An image by Cope Architecture of Knoxville showing what the rebuilt Ben Martin Track will look like at Oak Ridge High School.

 

A $1.3 million project is under way to rebuild the Ben Martin Track at Oak Ridge High School by June. The asphalt base of the eight-lane track dates back to the 1950s, the rubber surface is washing away, and holes are visible in the disintegrating and patched lanes. The pole vault has been unusable since 2017, and track coaches and athletes from other schools have recently declined to compete in Oak Ridge because of the conditions.

That is expected to change with the new renovated facility, which could host large invitational, sectional, and college track meets. The renovation project will rebuild the asphalt base of the track, add a new rubberized surface, and replace underground utilities. All field events except pole vault will move to the infield. Shot put and discus rings will be on the north end of the football practice field, while long jump and triple jump will be along the straight section of track nearest the bleachers. The pole vault will remain on the south side of the track, but it will move to the west end near the field house.

“This is a first phase of what we hope to be a larger project long-term,” Allen Thacker, Oak Ridge Schools supervisor of maintenance and operations, told the Oak Ridge Board of Education in October. “This is foundational.”

The project has been talked about “behind the scenes” for a handful of years, and there has been intense planning for about two years, according to those involved.

The rest of this story is available if you are a member: a subscriber, advertiser, or contributor to Oak Ridge Today. Already a member? Great! Thank you! Sign in here. Not a member? No problem! Subscribe here: Basic

  • Basic monthly subscription ($5 per month)—access premium content
  • Basic annual subscription ($60 per year)—access premium content

Pro

  • Pro monthly subscription ($10 per month)—access premium content, get breaking news emails first, and submit one press release or public service announcement per month
  • Pro annual subscription ($100 per year)—save $20 per year, access premium content, get breaking news emails first, and submit one press release or public service announcement per month

Temporary

  • Temporary access ($3 per week for two weeks)

If you prefer to send a check, you may do so by mailing one to: Oak Ridge Today P.O. Box 6064 Oak Ridge, TN 37831 We also have advanced subscription options. You can see them here. We also accept donations. You can donate here. A donation of $50 or more will make you eligible for a subscription. Thank you for reading Oak Ridge Today. We appreciate your support!

Filed Under: Education, Front Page News, Government, High School, K-12, Oak Ridge, Premium Content, Slider, Sports, Sports, Top Stories Tagged With: Allen Etheridge, Allen Thacker, Baseline Sports Construction, Ben Martin Track, Bruce Lay, Cope Architecture, Ed Wright, Oak Ridge Board of Education, Oak Ridge High School, Oak Ridge Schools, ORHS, Tom Sauer, track, track and field, track renovation

Search Oak Ridge Today

Classifieds

Public Notice: NNSA announces no significant impact of Y-12 Development Organization operations at Horizon Center

AVAILABILITY OF THE FINAL ENVIRONMENTAL ASSESSMENT FOR THE OFFSITE HOUSING OF THE Y-12 DEVELOPMENT … [Read More...]

ADFAC seeks contractors for five homes

Aid to Distressed Families of Appalachian Counties (ADFAC) is a non-profit community based agency, … [Read More...]

Public notice: Draft environmental assessment for Y-12 Development Organization at Horizon Center

AVAILABILITY OF THE DRAFT ENVIRONMENTAL ASSESSMENT FOR THE OFFSITE HOUSING OF THE Y-12 DEVELOPMENT … [Read More...]

Recent Posts

  • SNS on hiatus for upgrade
  • County sees increase in infant deaths due to unsafe sleeping practices
  • ASAP of Anderson welcomes new executive director
  • Briceville Fire Department celebrates new station
  • Officers searching for suspect in fatal shooting
  • Oak Ridge to host movie premiere of ‘Oppenheimer’
  • Oak Ridge Schools to host panel discussion, documentary screening for ‘Oppenheimer’
  • Sam Bush to headline Summer Sessions concert
  • Anderson County government offices closed Monday, Tuesday
  • Oak Ridge Community Band performs on Independence Day
A Twitter List by OakRidgeToday

Recent Comments

  • John Huotari on Power to TRISO at Horizon could cost $13 million
  • John Huotari on Lawsuit seeks 2020 election audit, voting machine restriction
  • Peter Scheffler on Lawsuit seeks 2020 election audit, voting machine restriction
  • Peter Scheffler on Power to TRISO at Horizon could cost $13 million
  • Matt Bailey on Dodson also wants to serve as mayor pro tem
  • Mark Caldwell on Dodson also wants to serve as mayor pro tem
  • Matt Bailey on Dodson also wants to serve as mayor pro tem
  • Mark Caldwell on Dodson also wants to serve as mayor pro tem
  • Matt Bailey on Dodson also wants to serve as mayor pro tem
  • Tracy Powers on Planning Commission to consider Main Street apartments, plan revisions

About Us

About Oak Ridge Today
What We Cover

How To

Advertise
Subscribe

Contact Us

Contact Oak Ridge Today

Copyright © 2023 Oak Ridge Today