• About
    • About Us
    • What We Cover
  • Advertise
    • Advertise
    • Our Advertisers
  • Contact
  • Donate
  • Send News
  • Subscribe

Oak Ridge Today

  • Home
  • Sign in
  • News
    • Business
    • Community
    • Education
    • Government
    • Health
    • Police and Fire
    • U.S. Department of Energy
    • Weather
  • Sports
    • High School
    • Middle School
    • Recreation
    • Rowing
    • Youth
  • Entertainment
    • Arts
    • Dancing
    • Movies
    • Music
    • Television
    • Theater
  • Premium Content
  • Obituaries
  • Classifieds


 







For members: Construction planned for SNS power upgrade

Posted at 12:21 pm July 19, 2019
By John Huotari Leave a Comment

The Spallation Neutron Source at Oak Ridge National Laboratory reached its operational power design level by running a neutron production cycle at 1.4 megawatts, the lab said Tuesday, Nov. 27, 2018. (Photo courtesy ORNL)

 

Construction is planned in December for a project to upgrade proton power at the Spallation Neutron Source at Oak Ridge National Laboratory.

The construction could last about one year, and it will be limited to the buildout of what is known as the klystron gallery, ORNL said in June. The klystron gallery houses the radio-frequency systems that power the structures used to accelerate a negatively-charged hydrogen ion beam in the linear accelerator at SNS.

SNS generates neutrons for scientific research by propelling protons down a linear accelerator. When the protons collide with a liquid mercury target, they create a “spall” of neutrons that are sent down beam lines surrounded by research instruments.

The proton power upgrade will eventually double the power of the SNS proton beam from 1.4 megawatts to 2.8 megawatts. The current total estimated project cost is $245 million.

The rest of this story, which you will find only on Oak Ridge Today, is available if you are a member: a subscriber, advertiser, or recent contributor to Oak Ridge Today.  Already a member? Great! Thank you! Sign in here. Not a member? No problem! Subscribe here: Basic

  • Basic monthly subscription ($5 per month)—access premium content
  • Basic annual subscription ($60 per year)—access premium content

Pro

  • Pro monthly subscription ($10 per month)—access premium content, get breaking news emails first, and join a private story discussion page
  • Pro annual subscription ($100 per year)—save $20 per year, access premium content, get breaking news emails first, and join a private story discussion page

Temporary

  • Temporary access ($3 per week for two weeks)

If you prefer to send a check, you may do so by mailing one to: Oak Ridge Today P.O. Box 6064 Oak Ridge, TN 37831 Note: Most news stories on Oak Ridge Today are free, brought to you by Oak Ridge Today with help from our advertisers, sponsors, and subscribers. Some are considered premium content. This story is premium content. Premium content can include in-depth, investigative, and exclusive stories.

Filed Under: Front Page News, Oak Ridge National Laboratory, ORNL, Premium Content, Slider, U.S. Department of Energy Tagged With: accelerator beam, construction, DOE, expression of interest, hydrogen ion, klystron gallery, liquid mercury target, Morgan McCorkle, neutron scattering, neutrons, Oak Ridge National Laboratory, ORNL, proton beam, proton power upgrade, protons, Second Target Station, SNS, Spallation Neutron Source, tungsten target, U.S. Department of Energy, UT-Battelle

Neutron production at ORNL’s SNS reaches design power level

Posted at 2:05 pm December 3, 2018
By Oak Ridge Today Staff Leave a Comment

The Spallation Neutron Source at Oak Ridge National Laboratory has reached its operational power design level by running a neutron production cycle at 1.4 megawatts, the lab said Tuesday, Nov. 27, 2018. (Photo courtesy ORNL)

The Spallation Neutron Source at Oak Ridge National Laboratory has reached its operational power design level by running a neutron production cycle at 1.4 megawatts, the lab said Tuesday, Nov. 27, 2018. (Photo courtesy ORNL)

 

The Spallation Neutron Source at Oak Ridge National Laboratory has broken a new record by ending its first neutron production cycle in fiscal year 2019 at its design power level of 1.4 megawatts.

Higher power provides more neutrons for researchers who use the facility to study a wide range of materials, an ORNL press release said. The achievement marks a new operational milestone for neutron scattering in the United States and opens the door to studying significantly smaller materials with greater complexity, the press release said.

“The operation of SNS at 1.4 megawatts this cycle has been an outstanding achievement,” said Paul Langan, associate laboratory director for neutron sciences. “It reflects on the maturity of our facility and the high level of technical excellence of our engineering, operational, and scientific staff.”

The power increase was enabled by the combination of extensive improvements to the linear accelerator, including the recent replacement of the radio frequency quadrupole—the first accelerating structure of the accelerator’s frontend assembly, as well as improvements to the liquid mercury target. [Read more…]

Filed Under: Front Page News, Oak Ridge National Laboratory, Top Stories, U.S. Department of Energy Tagged With: DOE Office of Science, linear accelerator, liquid mercury target, neutron scattering, neutron science, Oak Ridge National Laboratory, ORNL, Paul Langan, power level, pulsed accelerator-based neutron scattering, SNS, Spallation Neutron Source, Thomas Zacharia, U.S. Department of Energy

SNS completes full neutron production cycle at record power level

Posted at 3:31 pm August 9, 2018
By Oak Ridge Today Staff Leave a Comment

As protons (pink) strike the target vessel and pass into the liquid mercury inside, the protons are absorbed, creating neutrons (blue) that are then sent through moderators and beam tubes to research instruments to study the fundamental properties of materials. (Image credit: Jill Hemman/Oak Ridge National Laboratory, U.S. Department of Energy)

As protons (pink) strike the target vessel and pass into the liquid mercury inside, the protons are absorbed, creating neutrons (blue) that are then sent through moderators and beam tubes to research instruments to study the fundamental properties of materials. (Image credit: Jill Hemman/Oak Ridge National Laboratory, U.S. Department of Energy)

 

The Spallation Neutron Source at the U.S. Department of Energy’s Oak Ridge National Laboratory has reached a new milestone by operating a complete neutron production run cycle at 1.3 megawatts, a press release said.

“Achieving the record power level with a remarkable 94 percent accelerator beam availability establishes a new baseline of operation as well as a path to operate reliably at higher powers,” the press release said. “Increased power offers researchers the ability to conduct faster scientific analyses using neutrons on more types of materials.”

SNS, a DOE Office of Science User Facility, began operations in 2006 and is currently the world’s most powerful pulsed accelerator-based neutron scattering facility, used by scientists to reveal fundamental properties and behaviors of energy and materials at the atomic scale. Neutron contributions at SNS have resulted in advances in electronic devices, improved drug delivery, and stronger building materials for transportation infrastructure, the press release said. [Read more…]

Filed Under: Front Page News, Oak Ridge National Laboratory, ORNL, Slider, Top Stories, U.S. Department of Energy Tagged With: DOE, liquid mercury target, neutron production, neutron production cycle, neutrons, Oak Ridge National Laboratory, Office of Science, ORNL, pulsed accelerator-based neutron scattering, record power level, SNS, Spallation Neutron Source, U.S. Department of Energy, UT-Battelle

Search Oak Ridge Today

Classifieds

Public Notice: Comment period extended for Draft EA for Lithium Processing Facility at Y-12

EXTENSION OF THE COMMENT PERIOD FOR THE DRAFT ENVIRONMENTAL ASSESSMENT FOR THE LITHIUM PROCESSING … [Read More...]

Public Notice: Draft Environmental Assessment Available for Lithium Production Facility at Y-12

AVAILABILITY OF THE DRAFT ENVIRONMENTAL ASSESSMENT FOR THE LITHIUM PROCESSING FACILITY AT THE Y-12 … [Read More...]

Availability of the Final Environmental Assessment for the Oak Ridge Enhanced Technology and Training Center (ORETTC) (DOE/EA-2144), Finding of No Significant Impact, and Wetland Statement of Findings

The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) announces the … [Read More...]

Recent Posts

  • Controlled burns start this week on DOE land
  • Current status of city facilities due to COVID
  • Rep. Fleischmann tests positive for COVID
  • Oak Ridge man charged with second robbery
  • Mason, an IDB member, community volunteer, dies of COVID complications
  • Tammy Dunn appointed Oak Ridge city attorney
  • Which Wich closes
  • Obituary: David Lane Mason
  • Snow possible early Friday
  • Drone class to take flight this spring at Roane State
A Twitter List by OakRidgeToday

Recent Comments

  • Matt Bailey on Dodson also wants to serve as mayor pro tem
  • Mark Caldwell on Dodson also wants to serve as mayor pro tem
  • Matt Bailey on Dodson also wants to serve as mayor pro tem
  • Mark Caldwell on Dodson also wants to serve as mayor pro tem
  • Matt Bailey on Dodson also wants to serve as mayor pro tem
  • Tracy Powers on Planning Commission to consider Main Street apartments, plan revisions
  • johnhuotari on Four incumbents re-elected to Oak Ridge City Council
  • Levi D. Smith on Four incumbents re-elected to Oak Ridge City Council
  • samuel hopwood on Housing: Apartments proposed on former AMSE site
  • Matt Bailey on Robin Smith named Oak Ridge police chief

About Us

About Oak Ridge Today
What We Cover

How To

Advertise
Subscribe

Contact Us

Contact Oak Ridge Today

Copyright © 2021 Oak Ridge Today