Construction is planned in December for a project to upgrade proton power at the Spallation Neutron Source at Oak Ridge National Laboratory.
The construction could last about one year, and it will be limited to the buildout of what is known as the klystron gallery, ORNL said in June. The klystron gallery houses the radio-frequency systems that power the structures used to accelerate a negatively-charged hydrogen ion beam in the linear accelerator at SNS.
SNS generates neutrons for scientific research by propelling protons down a linear accelerator. When the protons collide with a liquid mercury target, they create a “spall†of neutrons that are sent down beam lines surrounded by research instruments.
The proton power upgrade will eventually double the power of the SNS proton beam from 1.4 megawatts to 2.8 megawatts. The current total estimated project cost is $245 million.
The rest of this story, which you will find only on Oak Ridge Today, is available if you are a member: a subscriber, advertiser, or recent contributor to Oak Ridge Today. Already a member? Great! Thank you! Sign in here. Not a member? No problem! Subscribe here: Basic
- Basic monthly subscription ($5 per month)—access premium content
- Basic annual subscription ($60 per year)—access premium content
Pro
- Pro monthly subscription ($10 per month)—access premium content, get breaking news emails first, and join a private story discussion page
- Pro annual subscription ($100 per year)—save $20 per year, access premium content, get breaking news emails first, and join a private story discussion page
Temporary
If you prefer to send a check, you may do so by mailing one to: Oak Ridge Today P.O. Box 6064 Oak Ridge, TN 37831 Note: Most news stories on Oak Ridge Today are free, brought to you by Oak Ridge Today with help from our advertisers, sponsors, and subscribers. Some are considered premium content. This story is premium content. Premium content can include in-depth, investigative, and exclusive stories.