
The right rear tire of a vehicle was stuck on the concrete rail of the Edgemoor Road bridge over the Clinch River after a two-vehicle crash between Oak Ridge and Claxton on Friday afternoon. (Photo by John Huotari/Oak Ridge Today)
The right rear tire of a vehicle was stuck on the concrete rail of the Edgemoor Road bridge over the Clinch River after a two-vehicle crash between Oak Ridge and Claxton on Friday afternoon.
The crash was reported at about 1:55 p.m. Friday. Authorities temporarily shut down Edgemoor Road at the bridge. Emergency workers were able to pull the vehicle off the rail at about 2:50 p.m. The stuck vehicle appeared to a compact SUV.
More information will be added as it becomes available.
Copyright 2015 Oak Ridge Today. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

The concrete rail on the Oak Ridge side of the Edgemoor Road bridge. The Bull Run Fossil Plant in Claxton is pictured in the background.
Leave a Reply